I-90 S-E RAMP over DIVISION ST

1.9 E JCT US 195 · County 063, Washington · Built 1967 · 2 Lanes · 15,622 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
0007954C0000000
Year Built
1967
Length
116.1 m (380.9 ft)
Max Span
38.1 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
15,622
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,167,000
Total Project Cost
$6,334,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.