I-405 over 115th AVE NE & TRAIL

0.2 N JCT SR 520 · County 033, Washington · Built 1965 · 5 Lanes · 67,108 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0007742A0000000
Year Built
1965
Reconstructed
1993
Length
90.2 m (295.9 ft)
Max Span
27.7 m
Width
25.3 m (83 ft)
Lanes
5
Daily Traffic
67,108
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,413,000
Total Project Cost
$10,826,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.