I-405 over BNRR & 115 AVE NE

0.2 N JCT SR 520 · County 033, Washington · Built 1954 · 5 Lanes · 67,108 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0004609B0000000
Year Built
1954
Reconstructed
1993
Length
61.9 m (203.1 ft)
Max Span
24.4 m
Width
21.6 m (70.9 ft)
Lanes
5
Daily Traffic
67,108
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,375,000
Total Project Cost
$6,750,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.