SR 99 over SR 518 RIVERTON HTS

4.9 N JCT SR 516 · County 033, Washington · Built 1962 · 6 Lanes · 33,632 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
0007046A0000000
Year Built
1962
Reconstructed
2011
Length
98.8 m (324.1 ft)
Max Span
29.6 m
Width
27.6 m (90.6 ft)
Lanes
6
Daily Traffic
33,632
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,079,000
Total Project Cost
$12,158,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.