I-5 over SR 167 NB
1.2 N JCT SR 7 · County 053, Washington · Built 1962 · 11 Lanes · 90,829 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
47.239431, -122.407239
This bridge is in worse condition than 57.5% of bridges in County 053. The average bridge in Washington is 0 years old; this one is 64 years old.
Nearby Bridges
N-N RAMP TO SR 167 over RAMP TO I-5 NB
Built 2016
I-5 over PORTLAND AVE
Built 1962
I-5 over PORTLAND AVE
Built 1962
I-5 over PUYALLUP RIVER/RR/SR 167
Built 2021
SR 167 over DRAINAGE
Built 1963
SB RAMP TO SR 167 over SR 167 RAMP TO SB I-5
Built 1963
I-5 over PUYALLUP R/RR/SR 167
Built 2017
PUYALLUP AVE over E 24TH&B ST& ABANDONED R
Built 1910
FISHING WARS XING over RAMP RR ROAD TERRAIN
Built 2019
PORTLAND AVE over PUYALLUP AVE NPRR
Built 1973
Bridge Details
- Structure #
- 0006821A0000000
- Year Built
- 1962
- Reconstructed
- 2012
- Length
- 36.9 m (121.1 ft)
- Max Span
- 14.9 m
- Width
- 56 m (183.7 ft)
- Lanes
- 11
- Daily Traffic
- 90,829
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,316,000
- Total Project Cost
- $10,633,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.