I-5 over PORTLAND AVE
1.1 N JCT SR 7 · County 053, Washington · Built 1962 · 7 Lanes · 105,864 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.239183, -122.410514
This bridge is in worse condition than 57.5% of bridges in County 053. The average bridge in Washington is 0 years old; this one is 64 years old.
Nearby Bridges
I-5 over PORTLAND AVE
Built 1962
N-N RAMP TO SR 167 over RAMP TO I-5 NB
Built 2016
I-5 over SR 167 NB
Built 1962
PORTLAND AVE over PUYALLUP AVE NPRR
Built 1973
FISHING WARS XING over RAMP RR ROAD TERRAIN
Built 2019
EAST L STREET over I-5
Built 2021
EAST L STREET over EAST 25TH STREET
Built 2007
I-5 over PUYALLUP RIVER/RR/SR 167
Built 2021
PUYALLUP AVE over E 24TH&B ST& ABANDONED R
Built 1910
SR 167 over DRAINAGE
Built 1963
Bridge Details
- Structure #
- 0006792B0000000
- Year Built
- 1962
- Reconstructed
- 2010
- Length
- 65.8 m (215.9 ft)
- Max Span
- 28 m
- Width
- 31.2 m (102.4 ft)
- Lanes
- 7
- Daily Traffic
- 105,864
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,130,000
- Total Project Cost
- $10,260,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.