I-5 over PORTLAND AVE

1.1 N JCT SR 7 · County 053, Washington · Built 1962 · 7 Lanes · 105,864 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0006792B0000000
Year Built
1962
Reconstructed
2010
Length
65.8 m (215.9 ft)
Max Span
28 m
Width
31.2 m (102.4 ft)
Lanes
7
Daily Traffic
105,864
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,130,000
Total Project Cost
$10,260,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.