I-5 over PUYALLUP RIVER/RR/SR 167

0.2 N JCT SR 167 · County 053, Washington · Built 2021 · 6 Lanes · 90,829 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0019157A0000000
Year Built
2021
Length
481.3 m (1579.1 ft)
Max Span
64 m
Width
23.3 m (76.4 ft)
Lanes
6
Daily Traffic
90,829
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$28,126,000
Total Project Cost
$56,252,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.