Hampton Blvd. SBL over Lafayette River

0.57 TO 165 /2.16 TO 247 · County 710, Virginia · Built 1994 · 3 Lanes · 14,688 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000021023
Year Built
1994
Length
534.9 m (1754.9 ft)
Max Span
21.3 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
14,688
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$789,700,000
Total Project Cost
$118,460,000