Terminal Blvd EBL over IS 564 Ramp & NS RR

1.65 MI FR INT SR 337 · County 710, Virginia · Built 1975 · 2 Lanes · 11,223 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000021028
Year Built
1975
Length
310.4 m (1018.4 ft)
Max Span
41.8 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
11,223
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$315,000,000
Total Project Cost
$472,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.