Terminal Blvd WBL over IS 564; NS RR & Ramp

1.67 MI TO INT SR 337 · County 710, Virginia · Built 1975 · 2 Lanes · 6,821 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000021026
Year Built
1975
Length
134.1 m (440 ft)
Max Span
40.2 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
6,821
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$118,100,000
Total Project Cost
$177,100,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.