NH 18 over CONNECTICUT RIVER

NH-VT SL · County 005, Vermont · Built 1934 · 2 Lanes · 1,115 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
200225B00103162
Year Built
1934
Reconstructed
1980
Length
162.5 m (533.1 ft)
Max Span
42.1 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
1,115
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,718,000
Total Project Cost
$3,142,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.