I-93 NB over CONNECTICUT RIVER

@VERMONT STATE LINE · County 009, New Hampshire · Built 1976 · 2 Lanes · 3,621 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
015301050013500
Year Built
1976
Reconstructed
2014
Length
204.8 m (671.9 ft)
Max Span
56.1 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
3,621
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.