I-93 NB over NH135

1.4MI VT LINE · County 009, New Hampshire · Built 1982 · 2 Lanes · 3,621 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
015301040013100
Year Built
1982
Length
28.7 m (94.2 ft)
Max Span
27.1 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
3,621
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.