TR 02 FAS 220 over CHANDLERS BROOK
2.5 MI W JCT. VT.18 · County 005, Vermont · Built 1927 · 2 Lanes · 120 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
44.341325, -71.951647
This bridge is in worse condition than 44% of bridges in County 005. The average bridge in Vermont is 0 years old; this one is 99 years old.
Nearby Bridges
I 00093 ML over I 93 OVER VT 18
Built 1982
I 00093 ML over I 93 OVER TH NO 17
Built 1982
I 00093 ML over I 93 OVER VT 18
Built 1982
I 00093 ML over I 93 OVER TH NO 17
Built 1982
I-93 SB over CONNECTICUT RIVER
Built 1981
I-93 SB over CONNECTICUT RIVER
Built 1981
I-93 NB over CONNECTICUT RIVER
Built 1976
I-93 NB over CONNECTICUT RIVER
Built 1976
I-93 SB over NH135
Built 1982
I-93 NB over NH135
Built 1982
Bridge Details
- Structure #
- 200220000403162
- Year Built
- 1927
- Length
- 27.7 m (90.9 ft)
- Max Span
- 8.8 m
- Width
- 6.6 m (21.7 ft)
- Lanes
- 2
- Daily Traffic
- 120
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $685,000
- Total Project Cost
- $735,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.