VT 00107 ML over 2ND BRANCH WHITE R.
0.1 MI W JCT. VT.14 · County 027, Vermont · Built 1937 · 2 Lanes · 5,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
43.827094, -72.566978
This bridge is in worse condition than 46.8% of bridges in County 027. The average bridge in Vermont is 0 years old; this one is 89 years old.
Nearby Bridges
C2006 over WHITE RIVER
Built 1928
I 00089 ML over I 89 OVER TH NO 35
Built 1968
I 00089 ML over I 89 OVER WR&NECR&107
Built 1968
I 00089 ML over I 89 OVER WR&NECR&107
Built 1968
I 00089 ML over I 89 OVER TH NO 6
Built 1968
I 00089 ML over I 89 OVER TH NO 32
Built 1968
VT 00014 ML over 2ND BRANCH WHITE R.
Built 2014
I 00089 ML over I 89 OVER TH NO 36
Built 1968
C2005 over WHITE RIVER
Built 1928
VT 00014 ML over 2ND BRANCH WHITE R.
Built 2015
Bridge Details
- Structure #
- 200150002114162
- Year Built
- 1937
- Reconstructed
- 1965
- Length
- 45.1 m (148 ft)
- Max Span
- 17.7 m
- Width
- 10.8 m (35.4 ft)
- Lanes
- 2
- Daily Traffic
- 5,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,358,000
- Total Project Cost
- $2,508,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.