C2005 over WHITE RIVER
0.15 MI TO JCT W VT14 · County 027, Vermont · Built 1928 · 1 Lanes · 400 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.809236, -72.546494
This bridge is in worse condition than 46.8% of bridges in County 027. The average bridge in Vermont is 0 years old; this one is 98 years old.
Nearby Bridges
I 00089 ML over I 89 OVER TH NO 36
Built 1968
I 00089 ML over I 89 OVER TH NO 6
Built 1968
C2006 over WHITE RIVER
Built 1928
TR 0TH13 over TH NO 13 OVER I 89
Built 1968
VT 00107 ML over 2ND BRANCH WHITE R.
Built 1937
C2001 over WHITE RIVER
Built 2002
VT 00014 ML over FIRST BRANCH WHITE R.
Built 2005
I 00089 ML over I 89 OVER TH NO 35
Built 1968
I 00089 ML over I 89 OVER WR&NECR&107
Built 1968
I 00089 ML over I 89 OVER WR&NECR&107
Built 1968
Bridge Details
- Structure #
- 101416003114161
- Year Built
- 1928
- Reconstructed
- 1982
- Length
- 62.8 m (206 ft)
- Max Span
- 61.3 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 400
- Material
- Steel
- Design
- Truss - Thru
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,230,000
- Total Project Cost
- $1,380,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.