I 00089 ML over I 89 OVER TH NO 32
0.6 MI N EXIT 3 · County 027, Vermont · Built 1968 · 4 Lanes · 16,100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.834578, -72.590361
This bridge is in worse condition than 46.8% of bridges in County 027. The average bridge in Vermont is 0 years old; this one is 58 years old.
Nearby Bridges
VT 00014 ML over 2ND BRANCH WHITE R.
Built 2014
I 00089 ML over I 89 OVER WR&NECR&107
Built 1968
I 00089 ML over I 89 OVER WR&NECR&107
Built 1968
VT 00014 ML over 2ND BRANCH WHITE R.
Built 2015
I 00089 ML over I 89 OVER TH NO 35
Built 1968
VT 00107 ML over 2ND BRANCH WHITE R.
Built 1937
TR 00TH6 over TH NO 6 OVER I 89
Built 1968
C2006 over WHITE RIVER
Built 1928
I 00089 ML over I 89 OVER TH NO 6
Built 1968
VT 00107 ML over WHITE RIVER
Built 2013
Bridge Details
- Structure #
- 200089002714162
- Year Built
- 1968
- Length
- 6.4 m (21 ft)
- Max Span
- 6.4 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 4
- Daily Traffic
- 16,100
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $279,000
- Total Project Cost
- $329,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.