I 00089 ML over I 89 OVER TH 3 & NECR
1.3 MI N EXIT 2 · County 027, Vermont · Built 1968 · 2 Lanes · 15,800 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.78195, -72.476247
This bridge is in worse condition than 46.8% of bridges in County 027. The average bridge in Vermont is 0 years old; this one is 58 years old.
Nearby Bridges
I 00089 ML over I 89 OVER TH3 & NECR
Built 1968
I 00089 ML over I 89 OVER VT14&WHT RV
Built 1968
I 00089 ML over I 89 OVER VT14&WHT RV
Built 1968
I 00089 ML over I 89 OVER TH NO 4
Built 1968
C2004 over BROAD BROOK
Built 1929
I 00089 ML over I 89 OVER TH17&FAY BK
Built 1968
I 00089 ML over I 89 OVER TH17&FAY BK
Built 1968
TR 03 FAS 177 over WHITE RIVER
Built 1928
I 00089 ML over I 89 OVER VT 132
Built 1968
I 00089 ML over I 89 OVER VT 132
Built 1968
Bridge Details
- Structure #
- 200089018N14172
- Year Built
- 1968
- Length
- 71.9 m (235.9 ft)
- Max Span
- 20.1 m
- Width
- 10.9 m (35.8 ft)
- Lanes
- 2
- Daily Traffic
- 15,800
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,941,000
- Total Project Cost
- $2,991,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.