I 00089 ML over I 89 OVER TH17&FAY BK

0.5 MI N EXIT 2 · County 027, Vermont · Built 1968 · 2 Lanes · 15,800 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
200089016S14172
Year Built
1968
Length
124.1 m (407.2 ft)
Max Span
33.5 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
15,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,014,000
Total Project Cost
$5,064,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.