I 00089 ML over I 89 OVER VT14&WHT RV

1.1 MI N EXIT 2 · County 027, Vermont · Built 1968 · 2 Lanes · 15,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
200089017N14172
Year Built
1968
Length
254.2 m (834 ft)
Max Span
72.8 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
15,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$10,362,000
Total Project Cost
$10,412,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.