C2003 over 2ND BRANCH WHITE R.
0.1 MI JCT TH 3 + TH 6 · County 027, Vermont · Built 1998 · 2 Lanes · 210 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
43.875222, -72.588417
This bridge is in worse condition than 18.6% of bridges in County 027. The average bridge in Vermont is 0 years old; this one is 28 years old.
Nearby Bridges
C3006 over 2ND BRANCH WHITE R.
Built 1938
C3078 over CROCKER BROOK
Built 2005
C3060 over 2ND BRANCH WHITE R.
Built 1904
VT 00014 ML over 2ND BRANCH WHITE R.
Built 1927
TR 00TH6 over TH NO 6 OVER I 89
Built 1968
VT 00014 ML over 2ND BRANCH WHITE R.
Built 2015
C3073 over 2ND BRANCH WHITE R.
Built 1929
VT 00014 ML over 2ND BRANCH WHITE R.
Built 2014
I 00089 ML over I 89 OVER TH NO 32
Built 1968
VT 00012 ML over GILEAD BROOK
Built 2020
Bridge Details
- Structure #
- 101404000414041
- Year Built
- 1998
- Length
- 22.3 m (73.2 ft)
- Max Span
- 21 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 210
- Material
- Steel
- Design
- Truss - Thru
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $662,000
- Total Project Cost
- $712,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.