C3060 over 2ND BRANCH WHITE R.
AT JCT TH 60 + VT 14 · County 017, Vermont · Built 1904 · 1 Lanes · 20 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
43.880822, -72.582008
This bridge is in worse condition than 17.2% of bridges in County 017. The average bridge in Vermont is 0 years old; this one is 122 years old.
Nearby Bridges
C2003 over 2ND BRANCH WHITE R.
Built 1998
C3078 over CROCKER BROOK
Built 2005
VT 00014 ML over 2ND BRANCH WHITE R.
Built 1927
C3006 over 2ND BRANCH WHITE R.
Built 1938
C3073 over 2ND BRANCH WHITE R.
Built 1929
VT 00014 ML over 2ND BRANCH WHITE R.
Built 2015
TR 00TH6 over TH NO 6 OVER I 89
Built 1968
VT 00014 ML over 2ND BRANCH WHITE R.
Built 2014
C3066 over 2ND BRANCH WHITE R.
Built 1904
VT 00014 ML over 2ND BRANCH WHITE R.
Built 1995
Bridge Details
- Structure #
- 100909004009091
- Year Built
- 1904
- Reconstructed
- 2009
- Length
- 16.5 m (54.1 ft)
- Max Span
- 14.9 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 20
- Material
- Wood or Timber
- Design
- Truss - Thru
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $405,000
- Total Project Cost
- $555,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.