I-70 (SR-70) WBL over BLAZE CANYON WASH
1 MI.WEST THOMPSON INTER. · County 019, Utah · Built 1976 · 2 Lanes · 10,152 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
38.957883, -109.742797
This bridge is in worse condition than 36.4% of bridges in County 019. The average bridge in Utah is 0 years old; this one is 50 years old.
Nearby Bridges
I-70 (SR-70) EBL over BLAZE CANYON WASH
Built 1976
I-70 (SR-70) WBL over CO.RD. & THOMPSON WA
Built 1975
COUNTY ROAD over THOMPSON WASH
Built 1919
I-70 (SR-70) EBL over SR-94 INTCHG X-RD
Built 1975
I-70 (SR-70) EBL over CO.RD. & THOMPSON WA
Built 1975
I-70 (SR-70) WBL over SR-94 INTCHG. X-RD
Built 1975
COUNTY ROAD over THOMPSON WASH
Built 2006
I-70 (SR-70) WBL over UPRR POTASH SPUR
Built 1976
I-70 (SR-70) EBL over UNION PACIFIC RAILROAD
Built 1976
I-70 (SR-70) EBL over US-191 (SR-191)
Built 1976
Bridge Details
- Structure #
- 4V1264
- Year Built
- 1976
- Length
- 9.6 m (31.5 ft)
- Max Span
- 4.1 m
- Lanes
- 2
- Daily Traffic
- 10,152
- Material
- Steel
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.