I-70 (SR-70) EBL over UNION PACIFIC RAILROAD

AT CRESCENT JCT. INTCHG · County 019, Utah · Built 1976 · 3 Lanes · 10,152 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
2F 362
Year Built
1976
Length
39.8 m (130.6 ft)
Max Span
14.1 m
Width
25.9 m (85 ft)
Lanes
3
Daily Traffic
10,152
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.