I-80 (SR-80) WBL over DELLE DRAINAGE CHANNEL

1.9 MILE EAST of DELLE · County 045, Utah · Built 1948 · 2 Lanes · 8,060 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
4C 238
Year Built
1948
Reconstructed
1972
Length
10.7 m (35.1 ft)
Max Span
9.4 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
8,060
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.