I-80 (SR-80) EBL over DELLE DRAINAGE CHANNEL

1.9 MILE EAST OF DELLE · County 045, Utah · Built 1972 · 2 Lanes · 8,060 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
2C 238
Year Built
1972
Length
10.6 m (34.8 ft)
Max Span
9.6 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
8,060
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.