CO.RD. TO ROWLEY over SKULL VALLEY DRAINAGE C

4 Miles W. of Rowley JCT. · County 045, Utah · Built 2021 · 2 Lanes · 1,021 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
045002E
Year Built
2021
Length
17.5 m (57.4 ft)
Max Span
4.6 m
Width
17.4 m (57.1 ft)
Lanes
2
Daily Traffic
1,021
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.