US-89SB ON-RAMP over SB. SHEPHERD LANE RAMP

CHERRY HILLS INTCHG. · County 011, Utah · Built 2004 · 1 Lanes · 4,410 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
3F 691
Year Built
2004
Length
49.9 m (163.7 ft)
Max Span
48 m
Width
10.1 m (33.1 ft)
Lanes
1
Daily Traffic
4,410
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.