US-89NB OFF-RAMP over NB.FRONTAGE ROAD

CHERRY HILLS INTCHG. · County 011, Utah · Built 2004 · 2 Lanes · 3,534 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
1F 692
Year Built
2004
Length
97.9 m (321.2 ft)
Max Span
48 m
Width
14.5 m (47.6 ft)
Lanes
2
Daily Traffic
3,534
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.