Gordon Avenue over Gordon Avenue
US-89 under Gordon Ave · County 011, Utah · Built 2022 · 4 Lanes · 1,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
41.031, -111.909
This bridge is in worse condition than 19.7% of bridges in County 011. The average bridge in Utah is 0 years old; this one is 4 years old.
Nearby Bridges
Nicholls Road over US-89
Built 2022
400 North over US-89
Built 2021
SR-273 INT. X-ROAD over US-89 (SR-89)
Built 2000
US-89SB ON-RAMP over SB. SHEPHERD LANE RAMP
Built 2004
Crestwood Road over Crestwood Road
Built 2023
US-89NB OFF-RAMP over NB.FRONTAGE ROAD
Built 2004
BURTON LANE over I-15 (SR-15) & UPRR
Built 1979
US-89 (SR-89) over SR-106 SHEPHARD LANE
Built 2004
I-15 (SR-15) NBL over SR-273
Built 1978
SHEPHERD LANE over I-15 (SR-15) & UPRR
Built 1979
Bridge Details
- Structure #
- 0F 907
- Year Built
- 2022
- Length
- 49.1 m (161.1 ft)
- Max Span
- 25.5 m
- Width
- 25.5 m (83.7 ft)
- Lanes
- 4
- Daily Traffic
- 1,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.