I-15 (SR-15) SBL over UTA LIGHT RAIL SPUR LINE

0.1 Mi.SO.OF 6400 SO.ST. · County 035, Utah · Built 1999 · 7 Lanes · 246,810 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
3F 611S
Year Built
1999
Reconstructed
2019
Length
68.9 m (226 ft)
Max Span
65.5 m
Width
32.7 m (107.3 ft)
Lanes
7
Daily Traffic
246,810
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.