RP.I-215EBtoI-15SB over UNION PACIFIC RAILROAD
0.2 MI.SO.6400 SOUTH ST. · County 035, Utah · Built 1998 · 2 Lanes · 246,810 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
40.629386, -111.903858
This bridge is in worse condition than 37.4% of bridges in County 035. The average bridge in Utah is 0 years old; this one is 28 years old.
Nearby Bridges
I-15 (SR-15) SBL over UNION PACIFIC RAILROAD
Built 1999
I-15 (SR-15) NBL over UNION PACIFIC RAILROAD
Built 2000
I-15 (SR-15) NBL over UTA LIGHT RAIL SPUR LINE
Built 2000
RP.I215EB TO I15SB over UTA LIGHT RAIL SPUR LINE
Built 1998
I-15 (SR-15) SBL over UTA LIGHT RAIL SPUR LINE
Built 1999
RP.I15NB to I215EB over LT.RAIL SPUR & 6400 S.ST
Built 1998
RP.I-15NBtoI-215WB over UPRR 6400 S.& I-215EB
Built 1998
I-15 (SR-15) NBL over 6400 SOUTH STREET
Built 2000
I-15 (SR-15) SBL over 6400 SOUTH STREET
Built 1999
RP.I215EB TO I15SB over WINCHESTER AVE.
Built 1998
Bridge Details
- Structure #
- 3C 830
- Year Built
- 1998
- Reconstructed
- 2019
- Length
- 213.2 m (699.5 ft)
- Max Span
- 102.4 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 246,810
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.