I-15 SB Off Ramp over I-15 SB On Ramp

I-15 SB Ramp to Triumph · County 049, Utah · Built 2019 · 1 Lanes · 23,546 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
3E2732
Year Built
2019
Length
32.5 m (106.6 ft)
Max Span
32.5 m
Lanes
1
Daily Traffic
23,546
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.