_I-15 over _SR-92 (SR92)

I-15 to SR-92 Interchange · County 049, Utah · Built 2020 · 7 Lanes · 177,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
1F 891
Year Built
2020
Length
76.8 m (252 ft)
Max Span
55.2 m
Width
33.6 m (110.2 ft)
Lanes
7
Daily Traffic
177,100
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.