I-15 SB off Ramp over I-15 SB on Ramp

I-15 SB off Ramp to Lehi · County 049, Utah · Built 2020 · 1 Lanes · 195,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
3E2734
Year Built
2020
Length
14.7 m (48.2 ft)
Max Span
13.8 m
Lanes
1
Daily Traffic
195,000
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.