I-15 (SR-15) SBL over COTTONWOOD CREEK

3 MI NO HARRISBURG INTER · County 053, Utah · Built 1963 · 2 Lanes

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
3E1301
Year Built
1963
Length
14.5 m (47.6 ft)
Max Span
5.1 m
Lanes
2
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.