I-15 NB over SR-9
I-15 over SR-9 · County 053, Utah · Built 2020 · 2 Lanes · 20,325 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
37.167128, -113.449731
This bridge is in worse condition than 27.1% of bridges in County 053. The average bridge in Utah is 0 years old; this one is 6 years old.
Nearby Bridges
I-15 SB over SR-9
Built 2020
SR-9 over CORAL CANYON BOULEVARD
Built 1999
TELEGRAPH ROAD over COTTONWOOD WASH
Built 2001
WASHINGTON PARKWAY over I-15 NB AND SB
Built 2005
I-15 (SR-15) SBL over COTTONWOOD CREEK
Built 1963
SR-9 over VIRGIN RIVER
Built 1992
SR-9 over Quail Creek Overflow
Built 1992
I-15 (SR-15) NBL over Cottonwood Creek
Built 1956
COUNTRY WAY over VIRGIN RIVER
Built 2013
SR-7; So. Parkway over Long Valley Road
Built 2013
Bridge Details
- Structure #
- 1F 894
- Year Built
- 2020
- Length
- 47.2 m (154.9 ft)
- Max Span
- 29.9 m
- Width
- 19.1 m (62.7 ft)
- Lanes
- 2
- Daily Traffic
- 20,325
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.