SR-9 over CORAL CANYON BOULEVARD
0.5 MI.EAST Of I-15 INT. · County 053, Utah · Built 1999 · 6 Lanes · 30,157 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
37.164703, -113.446525
This bridge is in worse condition than 41.2% of bridges in County 053. The average bridge in Utah is 0 years old; this one is 27 years old.
Nearby Bridges
I-15 NB over SR-9
Built 2020
I-15 SB over SR-9
Built 2020
TELEGRAPH ROAD over COTTONWOOD WASH
Built 2001
WASHINGTON PARKWAY over I-15 NB AND SB
Built 2005
SR-9 over VIRGIN RIVER
Built 1992
I-15 (SR-15) SBL over COTTONWOOD CREEK
Built 1963
SR-9 over Quail Creek Overflow
Built 1992
COUNTRY WAY over VIRGIN RIVER
Built 2013
I-15 (SR-15) NBL over Cottonwood Creek
Built 1956
SR-7; So. Parkway over Long Valley Road
Built 2013
Bridge Details
- Structure #
- 0F 672
- Year Built
- 1999
- Length
- 35.2 m (115.5 ft)
- Max Span
- 34.4 m
- Width
- 35.1 m (115.2 ft)
- Lanes
- 6
- Daily Traffic
- 30,157
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.