US-40 EB over Future County Road
US-40 over Future Cnty Rd · County 051, Utah · Built 2020 · 3 Lanes · 26,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
40.620194, -111.437417
This bridge is in worse condition than 18.8% of bridges in County 051. The average bridge in Utah is 0 years old; this one is 6 years old.
Nearby Bridges
US-40 WB over Future County Road
Built 2020
SR-319 INT.X-RD over US-40 (SR-40) EBL & WBL
Built 1990
US-40 WB over Future County Road
Built 2020
US-40 EB over Future County Road
Built 2020
DEER VALLEY DRIVE over DEER VALLEY LODGE ENT.
Built 1996
SR-40 (US-40) over COTTONWOOD CANYON ROAD
Built 1989
US-40 (SR-40) EBL over PROVO RIVER & ACCESS RD.
Built 1989
US-40 (SR-40) WBL over PROVO RIVER & ACCESS RD.
Built 1989
SR-224 over DEER VALLEY SKI RUN
Built 2003
SUBDVN.ACCESS ROAD over SR-224 GUARDSMAN PASS
Built 2008
Bridge Details
- Structure #
- 2F 926
- Year Built
- 2020
- Length
- 32.9 m (107.9 ft)
- Max Span
- 32.2 m
- Width
- 21.7 m (71.2 ft)
- Lanes
- 3
- Daily Traffic
- 26,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.