US-40 EB over Future County Road
US-40 over Future Cnty Rd · County 051, Utah · Built 2020 · 2 Lanes · 26,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
40.636333, -111.450278
This bridge is in worse condition than 18.8% of bridges in County 051. The average bridge in Utah is 0 years old; this one is 6 years old.
Nearby Bridges
US-40 WB over Future County Road
Built 2020
SR-319 INT.X-RD over US-40 (SR-40) EBL & WBL
Built 1990
US-40 EB over Future County Road
Built 2020
US-40 WB over Future County Road
Built 2020
DEER VALLEY DRIVE over DEER VALLEY LODGE ENT.
Built 1996
US-40 (SR-40) EBL over LOCAL COUNTY ROAD
Built 1989
US-40 (SR-40) WBL over LOCAL COUNTY ROAD
Built 1989
US-40 (SR-40) EBL over SR-248 INTCHG. X-RD
Built 1989
US-40 (SR-40) WBL over SILVER CREEK & ABD.R
Built 1989
US-40 (SR-40) EBL over SILVER CREEK AND ABD.R
Built 1989
Bridge Details
- Structure #
- 2F 925
- Year Built
- 2020
- Length
- 33.1 m (108.6 ft)
- Max Span
- 32.9 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 26,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.