SR-224 over DEER VALLEY SKI RUN
DEER VALLEY @ FLAGSTAFF · County 043, Utah · Built 2003 · 2 Lanes · 4,495 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
40.619683, -111.507283
This bridge is in worse condition than 24.1% of bridges in County 043. The average bridge in Utah is 0 years old; this one is 23 years old.
Nearby Bridges
SUBDVN.ACCESS ROAD over SR-224 GUARDSMAN PASS
Built 2008
DEER VALLEY DRIVE over DEER VALLEY LODGE ENT.
Built 1996
US-40 EB over Future County Road
Built 2020
US-40 WB over Future County Road
Built 2020
SR-319 INT.X-RD over US-40 (SR-40) EBL & WBL
Built 1990
US-40 EB over Future County Road
Built 2020
US-40 WB over Future County Road
Built 2020
US-40 (SR-40) EBL over SR-248 INTCHG. X-RD
Built 1989
US-40 (SR-40) EBL over LOCAL COUNTY ROAD
Built 1989
US-40 (SR-40) WBL over LOCAL COUNTY ROAD
Built 1989
Bridge Details
- Structure #
- 0D 838
- Year Built
- 2003
- Length
- 9.8 m (32.2 ft)
- Max Span
- 9.1 m
- Width
- 13.8 m (45.3 ft)
- Lanes
- 2
- Daily Traffic
- 4,495
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.