I-215 (SR-215) EBL over UNION PACIFIC RAILROAD

.2 MI.W.JCT.WITH I-15 NSL · County 011, Utah · Built 1969 · 2 Lanes · 35,708 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
2F 125
Year Built
1969
Length
95.3 m (312.7 ft)
Max Span
25.4 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
35,708
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.