I-15 (SR-15) over CENTER ST. (CUDAHY LN.)

WEST SIDE OF NO.SALT LAKE · County 011, Utah · Built 1997 · 10 Lanes · 164,022 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0C 804
Year Built
1997
Length
32.7 m (107.3 ft)
Max Span
23.3 m
Width
53.3 m (174.9 ft)
Lanes
10
Daily Traffic
164,022
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.