US-6 (SR-6) over SR-147
4TH NO.ST.in SPANISH FORK · County 049, Utah · Built 1971 · 4 Lanes · 25,245 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
40.115111, -111.635572
This bridge is in worse condition than 87.2% of bridges in County 049. The average bridge in Utah is 0 years old; this one is 55 years old.
Nearby Bridges
CENTER STREET over UNION PACIFIC RR
Built 1979
US-6 (SR-6) over I-15 (SR-15)
Built 2012
I-15 NB RP.to SR-6 over SR-156 SP.FORK MAIN ST.
Built 2011
I-15 (SR-15) SBL over SR-156 SP.FORK MAIN ST.
Built 2011
I-15 (SR-15) NBL over SR-156 SP.FORK MAIN ST.
Built 2011
I-15 SB RP.fr.SR-6 over SR-156 SP.FORK MAIN ST.
Built 2011
I-15NB (SR-15) over UPRR and WILLIAMS LANE
Built 2012
I-15NB (SR-15) over 300 WEST STREET
Built 2012
I-15SB (SR-15) over 300 WEST STREET
Built 2012
I-15SB OFF-RP.-US6 over UPRR AND WILLIAMS LANE
Built 2012
Bridge Details
- Structure #
- 0F 263
- Year Built
- 1971
- Reconstructed
- 2000
- Length
- 31.6 m (103.7 ft)
- Max Span
- 30.2 m
- Width
- 20.7 m (67.9 ft)
- Lanes
- 4
- Daily Traffic
- 25,245
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.