I-15 SB RP.fr.SR-6 over SR-156 SP.FORK MAIN ST.

SPANISH FORK INTERCHG. · County 049, Utah · Built 2011 · 1 Lanes · 48,010 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
3C1001
Year Built
2011
Length
50 m (164 ft)
Max Span
48.9 m
Width
9.4 m (30.8 ft)
Lanes
1
Daily Traffic
48,010
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.