I-15 NB RP.to SR-6 over SR-156 SP.FORK MAIN ST.

SP. FORK MAIN ST. INTCHG · County 049, Utah · Built 2011 · 1 Lanes · 48,010 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
1C 999
Year Built
2011
Length
56.9 m (186.7 ft)
Max Span
55.9 m
Width
9.4 m (30.8 ft)
Lanes
1
Daily Traffic
48,010
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.