I-15(SR-15)NB SB over CO.RD.TO KANES SPRING

3.2 MI.NO.SO.PAROWAN INT · County 021, Utah · Built 1974 · 4 Lanes · 24,421 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
0E1850
Year Built
1974
Length
7.3 m (24 ft)
Max Span
6.9 m
Width
91.3 m (299.5 ft)
Lanes
4
Daily Traffic
24,421
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.