I-15(SR-15)NB SB over CO.RD.TO KANES SPRING
3.2 MI.NO.SO.PAROWAN INT · County 021, Utah · Built 1974 · 4 Lanes · 24,421 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
37.865083, -112.821081
This bridge is in worse condition than 23.2% of bridges in County 021. The average bridge in Utah is 0 years old; this one is 52 years old.
Nearby Bridges
SR-274 INT. X-ROAD over I-15 (SR-15) NBL & SBL
Built 1973
CO.RD.-BIG FIELDS over I-15 (SR-15) NBL AND SBL
Built 1973
I-15 (SR-15) NBL over CO. RD. TO PAROWAN GAP
Built 1973
I-15 (SR-15) SBL over CO. RD. TO PAROWAN GAP
Built 1973
PAROWAN MAIN ST. over PAROWAN CREEK
Built 1925
PAROWAN CITY ST. over PAROWAN CREEK
Built 1950
SR-143 over I-15 (SR-15) NBL AND SBL
Built 1973
SR-271 INT. X-ROAD over I-15 (SR-15) NBL & SBL
Built 1975
I-15 (SR-15) SBL over CO.RD. NO.of SUMMIT INT.
Built 1973
I-15 (SR-15) NBL over CO.RD. N. OF SUMMIT Int.
Built 1973
Bridge Details
- Structure #
- 0E1850
- Year Built
- 1974
- Length
- 7.3 m (24 ft)
- Max Span
- 6.9 m
- Width
- 91.3 m (299.5 ft)
- Lanes
- 4
- Daily Traffic
- 24,421
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.