I-15 (SR-15) SBL over CO.RD. NO.of SUMMIT INT.

0.7 MI.NO.SUMMIT INTCHG. · County 021, Utah · Built 1973 · 2 Lanes · 28,854 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
3F 281
Year Built
1973
Length
47.6 m (156.2 ft)
Max Span
20 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
28,854
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.