SR-143 over I-15 (SR-15) NBL AND SBL
SO.PAROWAN INTERCHANGE · County 021, Utah · Built 1973 · 2 Lanes · 4,347 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
37.839347, -112.869353
This bridge is in worse condition than 23.2% of bridges in County 021. The average bridge in Utah is 0 years old; this one is 53 years old.
Nearby Bridges
I-15 (SR-15) SBL over CO. RD. TO PAROWAN GAP
Built 1973
I-15 (SR-15) NBL over CO. RD. TO PAROWAN GAP
Built 1973
PAROWAN CITY ST. over PAROWAN CREEK
Built 1950
PAROWAN MAIN ST. over PAROWAN CREEK
Built 1925
SR-274 INT. X-ROAD over I-15 (SR-15) NBL & SBL
Built 1973
I-15(SR-15)NB SB over CO.RD.TO KANES SPRING
Built 1974
I-15 (SR-15) SBL over CO.RD. NO.of SUMMIT INT.
Built 1973
I-15 (SR-15) NBL over CO.RD. N. OF SUMMIT Int.
Built 1973
CO.RD.-BIG FIELDS over I-15 (SR-15) NBL AND SBL
Built 1973
CO.RD.INTER X-ROAD over I-15 (SR-15) NBL AND SBL
Built 1970
Bridge Details
- Structure #
- 0C 537
- Year Built
- 1973
- Length
- 88.8 m (291.3 ft)
- Max Span
- 43.6 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 4,347
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.