US-40 (SR-40) over DRY GULCH CANAL

1.4 MILE NORTH OF MYTON · County 013, Utah · Built 1958 · 3 Lanes · 7,815 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
0E1096
Year Built
1958
Length
8.5 m (27.9 ft)
Max Span
7.8 m
Lanes
3
Daily Traffic
7,815
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.